This 300 foot tall, 10 foot diameter smoke stack was built in three sections and transported to Connecticut where it was erected and the sections were welded together.

This picture was taken from the hook of the erection crane, looking down at the top of the stack and the top platform.

CMF has built many smokestacks that have been placed around the country and overseas.

Rolling, fabricating and welding are the key processes required and of course the welds are X-rayed.